TRATOS recently supplied a 24 Optical Fibres cable suitable for subsea installation up to 200 meters in depth for the ADRIATIC LNG Terminal which required a continuous length of 18km.
The continual 18km length of Fibre in the TRATOS Cavi factory in Pieve S. Stefano (Italy).
The Adriatic LNG terminal on its way from Algeciras, Spain to it final destination near Rovigo, Italy in the northern Adriatic.